BaselineWatch
Desk

8.3 Post-Operational Phase

NIST platform security: roots of trust, firmware and secure enclaves SP 800-57 Part 1 Rev. 5 against SP 800-57 Part 1 Rev. 4
All changes in this version
unchanged 8 Transition: A transition plan should be developed and followed so that the changeover part of 8

Title

Post-Operational Phase

Control

During the post-operational phase, keying material is no longer in operational use, but access to the keying material may still be possible.