9.5.3.1 General Principles
All changes in this version
Title changed
Before · SP 800-57 Part 1 Rev. 4
After · SP 800-57 Part 1 Rev. 5
General Principles
Control changed
Before · SP 800-57 Part 1 Rev. 4
After · SP 800-57 Part 1 Rev. 5
Planning for recovery from system failures is an essential management function. Interruptions of critical infrastructure services should be anticipated, and planning for maintaining the continuity of operations in support of an organization’s primary mission requirements shall be done. With respect to key management, the following situations are typical of those for which planning is necessary: 1. Lost key cards or tokens; 2. Forgotten authenticators (e.g., tokens or passwords) that control access to keys; 3. The failure of key-input devices (e.g., readers, PIV cards); 4. The loss or corruption of the memory media on which keys and/or certificates are stored; 5. The compromise of keys; 6. Certificate termination without replacement certificates being installed; 7. The corruption of Certificate Revocation Lists (CRLs) or Compromised Key Lists (CKLs); 8. Hardware failure of key or certificate generation, registration, and/or distribution systems, subsystems, or components;