CP-04 Contingency Plan Testing
All changes in this version
Title
Contingency Plan Testing
Control
a. Test the contingency plan for the system [Assignment: frequency] using the following tests to determine the effectiveness of the plan and the readiness to execute the plan: [Assignment: organization-defined tests].
b. Review the contingency plan test results; and
c. Initiate corrective actions, if needed.
Discussion
Methods for testing contingency plans to determine the effectiveness of the plans and identify potential weaknesses include checklists, walk-through and tabletop exercises, simulations (parallel or full interrupt), and comprehensive exercises. Organizations conduct testing based on the requirements in contingency plans and include a determination of the effects on organizational operations, assets, and individuals due to contingency operations. Organizations have flexibility and discretion in the breadth, depth, and timelines of corrective actions.
Parameters
cp-4_prm_2: organization-defined tests
cp-04_odp.01: frequency
cp-04_odp.02: tests
cp-04_odp.03: tests
Related controls
at-3, cp-2, cp-3, cp-8, cp-9, ir-3, ir-4, pl-2, pm-14, sr-2
STIG rules that implement this control 0
No followed STIG rule cites a CCI indexed to this control (CCI list 2026-07-14).