BaselineWatch
287 requirements
Desk

NIST SP 800-53B (baselines) 5.2.0

AllACATAUCACMCPIAIRMAMPPEPLPSRASASCSISR
Controls in this version
RefTitleText
PE-01 Policy and Procedures
PE-10 Emergency Shutoff
PE-11 Emergency Power
PE-12 Emergency Lighting
PE-13 Fire Protection
PE-13(01)
in PE-13
Detection Systems — Automatic Activation and Notification
PE-14 Environmental Controls
PE-15 Water Damage Protection
PE-16 Delivery and Removal
PE-17 Alternate Work Site
PE-02 Physical Access Authorizations
PE-03 Physical Access Control
PE-04 Access Control for Transmission
PE-05 Access Control for Output Devices
PE-06 Monitoring Physical Access
PE-06(01)
in PE-6
Intrusion Alarms and Surveillance Equipment
PE-08 Visitor Access Records
PE-09 Power Equipment and Cabling

18 of 287.