Vulnerabilities
All
My stack
Known exploited
Public exploit
Critical (9+)
Likely exploited (EPSS ≥ 50%)
Changed, 24 h
New, 24 h
Sort:
risk
modified
published
CVSS
EPSS
| CVE | CVSS | EPSS | Vendor, product | Description | Modified |
|---|---|---|---|---|---|
| CVE-2019-10219exploit ×2 | 6.1 medium | 2.0% | redhat, netapp, hibernate_validator, fuse, jboss_data_grid | A vulnerability was found in Hibernate-Validator. The SafeHtml validator annotation fails to properly sanitize payloads consisting of potentially malicious code in HTML comments and instructions. This vulnerability can result in an XSS attack. | 8 Oct |
| CVE-2018-0734 | 5.9 medium | 12.0% | openssl, canonical, ubuntu_linux, debian_linux | The OpenSSL DSA signature algorithm has been shown to be vulnerable to a timing side channel attack. An attacker could use variations in the signing algorithm to recover the private key. Fixed in OpenSSL 1.1.1a (Affected 1.1.1). Fixed in OpenSSL 1.1.0j (Affected 1.1.0-1.1.0i). Fixed in OpenSSL 1.0.2q (Affected 1.0.2-1.0.2p). | 8 Oct |
2 of 2
Download these 2 as CSV · subscribe to this list.
EPSS scores: 2026-10-27. NVD cursor: 2026-10-28 23:22. The News page shows only notable CVEs (KEV, your stack, new criticals, EPSS over 50%, or active exploitation per SSVC); this table has all of them.